Completed Projects

ELTHAM LEISURE CENTRE

Client:
Nillumbik Shire Council
Architect:
Peddle Thorp Architects
Builder:
Behmer and Wright
Aquatic Consultant:
Hydratech Designs
Works:
 

Indoor 25m Pool 820m³ 27ºC

  • Deep Bed Sand Filters 
  • On-site Sodium Hypochlorite Solution - Prominent Fluid Controls 
  • Dosing Controller Dulcomarin - Prominent Fluid Controls 
  • ISO End Solution Pumps - Davey Water
  • Medium Pressure UV System - Prominent Fluid Controls
  • PLC Switchboard Roejen

Indoor Program Combined Spa 350m³ 33ºC/36ºC

  • Deep Bed Sand Filters
  • On-site Sodium Hypochlorite Solution - Prominent Fluid Controls  
  • Dosing Controller Dulcomarin - Prominent Fluid Controls 
  • ISO End Solution Pumps - Davey Water
  • Jet Pumps - Pentair Water

Indoor Leisure Pool 330m³ 29ºC

  • Water Features - Vortex 
  • Jet Pumps - Pentair Water
  • Deep Bed Sand Filters 
  • On-site Sodium Hypochlorite Solution - Prominent Fluid Controls 
  • Dosing Controller Dulcomarin - Prominent Fluid Controls 
  • ISO End Solution Pumps - Davey Water
  • Medium Pressure UV System - Prominent Fluid Controls

Outdoor Splash Pad

  • Connected to the 25m Filtration Plant 
  • Vortex Water Feature 

The Project was completed in October 2018

WESTBOURNE GRAMMAR SCHOOL

Client:
Westbourne Grammar
Architect:Croxon Ramsay
Builder:Building Engineering
Aquatic Consultant:Creo Consultants
Location:300 Sayers Rd, Truganina VIC 3029
Works:
Indoor 25 metre pool & Program Pool
Indoor 25 metre pool 840m³ 28ºC       
  • Horizontal Sand Filters
  • PRO-CAL 3240A Calcium Hypochlorite System
  • Dosing Controller Dialog - Prominent Fluid Controls 
  • PLC Switchboard Roejen
  • ISO End Suction SS Pumps - Pentair Water
Indoor Program Pool 70m³ 32ºC
  • Vertical Sand Filters
  • PRO-CAL Dosing Controller 
  • PLC Switchboard Roejen
The project was completed in November 2018

CARLTON FOOTBALL CLUB

Client:
Carlton Football Club
Architect:
Johns Lyng Group
Builder:
Peter Snelling
Aquatic Consultant:
15-metre indoor warm water exercise pool 34oC
Works
2 x cold Vaso treadmill pool 10-12oC
1 x hot Vaso treadmill pool 40oC
Concrete cell filter design
Ozone/Bromine System
Chiller and boiler plant
State of the art PILC switchboard
The Carlton Football Club project is the first of its kind in Australia with underwater treadmills which operate in the hot and cold Vaso pools. With the intense speed of the modern day AFL game, recovery has become a vital part of football clubs' preparation each week.

Other Completed Projects

  • Alto Apartments
  • 35 Spring Street
  • Prima Pearl Appartments
  • Austin Health & Rehab Centre
  • Ballarat Aquatic Centre
  • Bellarine Aquatic Centre
  • Benalla Aquatic Centre
  • Broadmeadows Leisure Centre
  • Carlton Football Club
  • City Square - Westin Hotel
  • Crown Metropol Hotel
  • Epworth Hospital Geelong
  • Eastern Beaches Pool
  • Eureka Towers
  • Fitzroy Leisure Centre
  • Frankston Hospital
  • Geelong Football Club
  • Horsham Aquatic Centre
  • Kooyong Tennis Club
  • Leongatha Leisure Centre
  • Melbourne Aquarium
  • Simonds Stadium Stage 4
  • Geelong F.C

 

  • Melbourne Crown Casino
  • Amii Park
  • Melbourne University Beaurepaire Pool
  • Mentone Grammar
  • Noble Park Aquatic Centre
  • Qantas Flight Centre
  • RACV City Club
  • RACV Healesville
  • RACV Inverloch
  • Richmond Aquatic Centre
  • Richmond Football Club
  • Royal South Yarra Tennis Club
  • Sandringham Leisure Centre
  • Sunshine Leisure Centre
  • Torquay Sands
  • The Resort Torquay
  • Virgin Active Melbourne
  • Werribee Outdoor
  • Camberwell Grammar
  • Yarra Junction Aquatic Centre
  • Eltham Leisure Centre 
  • Westbourne Grammar
  • Yarra Valley Grammar